Foundation Design Philosophy for Vertical Vessel / Tower
In
this page I will talk about Vertical vessel/Tower
equipment foundation load calculation. Following are some
pictures
of Vertical vessel /Tower:
Picture-1 (Left) - A tall tower vessel resting on skirt and on
Foundation.
Picture-2 (Right) - A small vertical vessel resting on legs and on
fpundation.
Now you will follow the following steps to start the foundation load
calculation and design:
Step-1 : Review
of vessel drawing (Vendor Equipment Drawing)
You
need to review Vessel drawings from foundation design point of view and
check whether you have all the following information:
- Vessel
Erection weight (De1):
- Vessel
Empty weight (De2):
- Vessel
Operating weight (Do):
- Vessel
Hydrotest weight (Dt):
- Wind
Shear and Moment
- Seismic
Shear and Moment (if the Project site is at Seismic zone)
- Total
Height of vessel
- Vessel
Center of Gravity location for Seismic load calculation and application
- Anchor
bolt location (Bolt circle Dia) with respect to center of vessel and
also bolt offset with respect to Plant North line.
- Anchor
bolt supporting detail ( Anchor bolt size and detail of
anchor chair)
- Base
plate detail
Step-2 :
Verification of
foundation location, elevation
and external fittings loads
You
need to review Plot plan, Equipment location drawings and 3
-D Models and
check whether you have all the following information:
- Verify the area available
for foundation.
- Verify
Foundation location and Elevation
- Pipe
supports and Nozzle loads on Equipment (Dp)
- Location
and size of Platforms around the vessel
- Locations
of underground pipes
- Electrical
and Instrument duct banks
- Locations
and extent of adjacent foundations
- Verify
the location and extent of new/existing foundations not shown in 3D
model or plot plan.
Step-3
: Description of Foundation Loads:
Please
follow this section to understand the different loads on foundation:
Vessel Erection weight (De1): The erection
weight is the fabricated weight of
the vessel, plus internals, platforms, etc., that are actually erected
with the
vessel. Data from Equipment drawing.
Vessel Empty weight (De2): The
empty weight is the in-place weight of the
completed vessel, including the fabricated weight of the vessel, plus
the
weight of internals, piping, insulation, and platforms, but excluding
the
weight of fluids or products which will be contained in the vessel
during
operation. Data from
Equipment drawings.
Vessel Operating weight (Do): Vessel
Empty weight (De2) + Weight of Fluid inside the
vessel. Data from Equipment drawings.
Vessel Hydrotest weight (Dt): Vessel
Empty weight (De2) + Weight of test water
Pipe supports and Nozzle loads on Equipment (Dp): Please
Coordinate with the Pipe Stress Group for
determination of nozzle
loads and loads due to pipe supports
attached to the vessel.
Wind
Shear and Moment: You will find this load data in vendor drawings.
However, you have to calculate this load based on project design basis.
During wind load calculation, you need to consider the pipes and
platforms attached with the vessel. Compare both the data (vendor load
data and your calculated data) and apply the critical one for
foundation design.
Seismic Shear and Moment (if the Project
site is at Seismic zone): You
will find this load data in vendor drawings. However, you have to
calculate this load based on project design basis. During seismic load
calculation, you need to consider the pipes and platforms attached with
the vessel. Compare both the data (vendor load data and your calculated
data) and apply critical one for foundation design.
Step-4 :
Pedestal Sizing Criteria:
Concrete pedestals supporting vertical vessels
shall be
sized according to the following criteria:
Face-to-face
pedestal size shall be the larger of the following:
(a) Bolt circle
+ 175mm
(b) Bolt circle
+ 8 x bolt diameters
(c) Bolt circle
+ sleeve diameter + 150mm
(d) Diameter of baseplate
+ 100mm
(e) Bolt circle + 2 x
(minimum bolt edge
distance)
Pedestals
having a diameter or least dimension across sides that is equal to or
greater
than 1.5m shall be octagonal in shape.
All other pedestals shall be square in shape. For ease of forming, use
multiples of 25mm for each octagonal side or side of square.
It
is desirable to make the pedestal deep enough to contain the anchor
bolts and
keep them out of the mat.
Step-5
: Anchor
Bolt Check:
Design of anchor bolts shall be based on the
following considerations. Corrosion
allowance should be considered when required by the project
design criteria.
Tension
Check:
The maximum tension force in the anchor bolts (Tmax) may be calculated according with
following formula:
Tmax
= 4*M / (Nb x BCD)
- (De1 or De2)
/ Nb
Where, M = total maximum moment on foundation
BCD = Bolt circle diameter
Nb = no. of anchor bolt
Use De1 or De2 whichever
is critical.
The
above formula provides a conservative value of Tmax
compared to the
concrete transformed section method.
Shear
Check:
When
anchor bolts are utilized to resist shear, the unit shear per bolt
shall be calculated as follows:
Vmax = V / Nb
where, V = total shear force on anchor bolt.
When
oversized anchor bolt holes are provided in the vessel base plates or
when
anchor bolt sleeves that are not grout-filled are used, anchor bolts
should be
designed to resist tension only.
Frictional
resistance to shear between the vessel base plate and the concrete or
grouted
bearing surface shall be utilized to resist shears induced by wind or
by other
static loads. Frictional
resistance
shall not be employed to resist shear induced by seismic loads. For seismic-induced shear,
adequate
mechanical means shall be provided to resist horizontal shear, either
by means
of properly detailed anchor bolt / bolt hole arrangements or through a
combination of anchor bolts, shear lugs, or other anchorage devices. The static coefficient of
friction between
steel and concrete or between steel and cementitious grout shall be
considered
as 0.4 or specified in project design criteria.
Tension
Shear Interaction check:
When
anchor bolts are subjected to combined shear and tension loads, the
design
shall be based on satisfying interaction formula
(say Appendix-d of ACI 318).
Please note that anchor bolt edge distance, spacing and load capacity
shall be as per project design criteria.
Step-6
: Load combinations for foundation sizing /
Pile loads
and Foundation design:
You
need to create the load combination per your project design criteria.
However, I have created this load combination based on ACI 318:
Load
combination for Foundation sizing and Pile load calculation
(un-factored load calculation):
- LC1:
Do + Dp
- LC2:
(De1 or De2) + Wind
- LC3:
De2 + Seismic
- LC4:
Do + Dp + Wind
- LC5:
Do + Dp + Seismic
- LC6:
Dt + 025*Wind
Load
combination for Pedestal and Foundation design (factored load
calculation):
- LC7:
1.4*(Do + Dp)
- LC8:
0.75 [1.4 De2
(or 1.4 De1)] +1.6 Wind
- LC9:
1.2 De2 +1.0 E
- LC10:
0.75 (1.4 Do + 1.4 Dp)
+ 1.6 Wind
- LC11: 1.2 (Do + Dp)
+ 1.0 E
- LC12: 0.75 (1.4 Dt) + 1.6 (0.25 W)
The
weight of the foundation and of the soil on top of the foundation shall
be included as dead load in all of these load combinations.
Now from
above steps, you have learnt the following:
- Different
types of loads on foundation
- Different
criterias for the pedestal sizing
- Maximum
tension and shear force on each anchor bolt
- A
sample load combinations.
To complete
the foundation design, your work will be to create following
calculation sheets:
- A
calculation sheet for anchor bolt embedment length check (ex: ACI 318
appendix-D).
- A
calculation sheet for foundation sizing (considering soil bearing
pressure, Sliding, Buoyancy and overturning) or pile load (tension,
compression and shear on each pile) calculation and check with soil
consultant for acceptable values.
- A
calculation sheet for foundation and pedestal reinforcement calculation
per your project design criteria.
For typical Platform and
foundation for a Vertical Vessel / Tower click here
Discussions:
Question from
visitor: What is the reference of anchor bolt tension calculation
formula?
Answer from
Subhro: Refer "ASCE task committee on anchor bolt design"
clause #3.5.1.1 - vessel anchor bolt design.
Question
from visitor: How do I calculate the wind load on vertical vessel?
Answer
from Subhro: Refer "Wind load and anchor bolts design for
petrochemical facility by ASCE"
I
hope this page will be very helpful to you to understand the basic
foundation loads of a Vertical Vessel / Tower.
Please
donate generously for more development of this site:
Copyright 2009.
All rights reserved. Please do not print or copy of this page or any
part of this page without written permission from Subhro Roy.
Disclaimer:
This page is prepared based on experience on Civil Engineering Design.
All definitions and most of the explanations are taken from different
text books and international design codes, which are referenced in the
contents. Any similarity of the content or part of with any company
document is simply a coincidence. Subhro Roy is not responsible for
that.